Design and Build Control Building Package

Industry: Midstream

Location: Mont Belvieu, Texas

BG Division: Industrial Buildings & Architecture

Project Name: Midstream Control Building Design/Build

Scope: Design/Build 5,300 sf Control Building

Client Benefits: Control Building for Midstream Unit Operations

Project Drivers & Client Challenges:
Fast track schedule so the client could begin unit operations.

Burrow Global Scope of Supply:

  • Permitting
  • Civil/Structural Engineering
  • Architectural Design
  • Electrical Engineering
  • Mechanical Engineering
  • Plumbing/Aerobic Design
  • Construction

Project Description: 
The Midstream Unit Control Building Project involved building a control building (5376 sf). The scope included the control building with the foundation consisting of drilled piers, grade beams, and slab. The building was constructed with CMU block walls and a concrete roof (with modified bitumen cover). There was a control room, offices, a mechanical room, an electrical room, a kitchen (with appliances), a conference room, and restroom facilities, UPS system (by Others), backup generator (by Others), HVAC, and fire alarm. Also, BGS installed an aerobic system for the building sanitary. The project was managed by Burrow Global and most construction crafts were subcontracted. The client was very satisfied with the control building and the work performed.

Key Words:
Design, Build Buildings, Office, Control Buildings, Turnkey Buildings, Construction Buildings, Industrial Buildings