Bayou Bridge Pipeline System

Timeframe: 2014-2016

Engineering Phases: FEED & Detail Design

Similar Deliverables/Tasks: Hydraulics, Datasheets, Scheduling, Estimating, P&IDs, PFD, Plot Plans, Grading Design, Foundation Details, One-Line Diagrams, Loop Diagrams, C&C Plans, Procurement

Burrow Global Scope of Work:
 
50 mile 30 inch pipeline
 
Metering

  • Two 3 x 10 inch coriolis meter skids

 
Vertical Can Booster Pump

  • 1,500 HP
  • VFD
  • MCC/Building
  • Switchgear

 
Mainline Pumps

  • 4,000 HP each
  • VFDs
  • MCC/Building
  • Switchgear
  • Transformers