Rubber Mixing Building

Industry: Industrial Manufacturing

Location: Humble, Texas

BG Division: Industrial Buildings & Architecture

Project Name: Manufacturing Mixing Building Project

Scope: Build 48,000 sf Office. Warehouse, and Manufacturing Building

Client Benefits: New offices, manufacturing, and testing facilities with expandable end wall for future expansion.

Project Drivers & Client Challenges:
Fast-Track schedule so the client could begin manufacturing product.

Burrow Global Scope of Supply:

  • Permitting
  • Pre-engineered Metal Building
  • Construction

Project Description: 
The Mixing Building Project involved building an office, warehouse, and manufacturing building (48,579 sf). Scope of work included the building foundation consisting of drilled piers, grade beams, and slab. Large concrete pit areas were included for manufacturing equipment with structural steel, grating, ladders, stairways, and handrails. The building was constructed as an FM Global rated pre-engineered metal building with (2) 20 Ton bridge cranes (expandable to two more bridge cranes, one per runway if client needed to add in the future), expandable endwall to expand the building in the future, gable roofs for high bay area and manufacturing area, lean-to’s on both sides of the building, insulation in the roof, insulated exterior wall panels, interior liner panels and drywall , standing seem roof, trim, gutters and downspouts, Kalwall translucent panels, windows, exterior walk doors and numerous interior and exterior overhead doors, and a storefront. There were offices, mechanical rooms, electrical rooms, a boiler room, boiler and electrical yards, a breakroom/kitchen, a large manufacturing warehouse and high bay carbon area, IT room, equipment mezzanines, and restroom facilities. Ceramic tile was used in the restrooms and locker areas, linoleum in the hallways and offices with base, and 2x2 ceiling tile in the occupied areas. Electrical, plumbing and HVAC work was by Others. Sitework included several driveways, numerous sidewalks, containment areas for equipment, and equipment platforms. The client was very satisfied with the building and the work performed.

Key Words:
Design, Build Buildings, Office, Manufacturing, Warehouse and Testing Buildings, Turnkey Buildings, Construction Buildings, Industrial Buildings