Oil Production Blowcase

Industry: Construction

Location: Crystal City, Texas

Client Benefits: Proper disposal of waste products

Project Drivers & Client Challenges:
This project was driven by the client’s need to remove
water and oil from various compressor skids within the production system.

Burrow Global Scope of Supply:

  • Engineering
  • Fabrication
  • Quality Assurance
  • Mechanical Installation

Scope Description:
To fabricate and ASME code a ten gallon blowcase for use in the oil production system.

The detailed scope includes:

  1. Procure materials & supplies
  2. Fit & weld blowcase
  3. X-Ray welds to confirm quality
  4. Affix ASME coded stamp
  5. Install the following:
  • Level switch
  • Kimray motor operated valves
  • Pressure safety valve
  • Fuel gas tubing
  1. Deliver to site
  2. Tie in blowcase to suction line, discharge line & fuel gas supply

 Key Words:
Coded vessel design, Coded vessel construction, Vessel installation